- Each group is required to prepare two types of project report for their proposed ‘Amphitheatre Stage’, which are:
- Progress Report
- Design Proposal Report (Final Report)
There are many things to be included in these reports.
For the ‘Proposed Design Development’ part, students are encouraged to
just reduce the A1 size presentation drawing board to A3 size presentation
drawing paper and attached it as Appendix A in the report.
For the construction method, students need to mention the type (traditional/conventional,
modular, IBS, mixed etc.), propose the superstructure and substructure used and
explain the rationales why the method of construction is selected.
For the ‘material selection’, students need to mention the material selected
for roof, floor area, stage background (if any) and all applied structures
(column, roof structure, shading device, base etc.) together with the detailing of structural joints (3 details).
For building services, students should focus on lighting system, sound
and Public Address (PA) system.
As simple estimation budget for the stage construction, each group
need to provide an Elemental Cost Analysis (ECA) that consider the structure,
finishes and basic services of their project. In addition to ECA, each group also needs to provide estimation cost
for their physical scale model construction (Model Cost Estimate) of their
STAGE. In the report, each group needs to provide its own project scheduling
and management plan. Besides, each group also needs to state the role of each group
members, organization chart of the Group and simple gantt chart (reporting on the project).
From here, I had learnt about many different things in which other courses/major will learn. With this, it enables me to gain more knowledge about it and I believe that it is going to be very useful for me.